Terex Dungannon, Structural Enhancements to Crane Rail
The Project delivered construction works for the Structural Enhancements to the existing crane rails in Hall J to support the installation (by others) of two new cranes for Terex operational needs.
Key Features:
- Breaking out of existing concrete floor slab, installation of pad foundations and reinstatement of the floor
- Installation of additional supporting structural steel columns to the existing crane rail and structural support bridging elements
- Remove existing crane rail guide track and install new guide
- Remove existing roller shutter door and reinstate with blockwork and cladding
- Works were undertaken outside of Terex normal working hours
Key Project Information
Architect | Albert Fry Associates |
Value | 110 K |
Duration | 6 Weeks |
Extra Information
Location | Dungannon, Co Tyrone |
Sectors | Commercial |