Moville Community College, Co. Donegal

Woodvale Construction Company Ltd was appointed to deliver the phased redevelopment of Moville Community College, located at Carrownaffe, Moville, Co. Donegal, on a prominent coastal site overlooking Lough Foyle.

The project comprised the demolition and removal of 17 existing temporary prefabricated teaching buildings, while the existing two-storey permanent school remained fully operational throughout the works. Careful planning, phased delivery, and strict segregation ensured uninterrupted school operations for pupils and staff.

A new permanent two-storey post-primary school building with a gross floor area of approximately 5,275m² was constructed, providing modern, high-quality accommodation to support teaching, learning, and specialist educational needs. The new facility was seamlessly connected to the existing school via an enclosed first-floor link corridor.

Throughout the project, Woodvale Construction worked in close collaboration with the design team, client representatives, school leadership team and the wider project stakeholders to manage the complexity of the live school environment, challenging ground conditions, and the exposed coastal setting. This collaborative approach ensured the successful delivery of the project to programme and quality expectations.

Key Features:

  • 10 general classrooms and 8 specialist teaching rooms
  • Dedicated Special Educational Needs (SEN) suite with SEN classrooms
  • PE hall with supporting accommodation
  • Double-height general-purpose hall with associated kitchen and stores
  • Staff facilities, administration areas, toilets, and storage
  • Enclosed first-floor link corridor connecting to the existing school

External Works & Infrastructure

  • Reconfigured vehicular and pedestrian access arrangements
  • New bus drop-off zones and circulation routes
  • 54 additional car parking spaces, including accessible and bus spaces
  • External ball courts and SEN hard and soft play areas
  • Stormwater attenuation systems and a new wastewater treatment plant
  • Rainwater harvesting and water storage infrastructure
  • Diversion of existing ESB services
  • Extensive hard and soft landscaping across the campus

Sustainability & Quality

The building was designed and constructed with a strong focus on sustainability, durability, and environmental performance, incorporating rainwater harvesting, energy-efficient building services, and robust fabric-first principles appropriate for a coastal location.

Project Delivery

The project was delivered through a carefully planned phased programme, enabling the existing school to remain fully operational throughout construction. Phase 1 was successfully completed in December 2025, delivering the new permanent school building and associated primary infrastructure. Phase 2 is scheduled for completion in early 2026 and will include the remaining external works, landscaping, and final campus enhancements.

Woodvale Construction Company Ltd is proud to be delivering this important education project, providing a modern, inclusive learning environment that will support pupils, staff, and the Moville and wider Donegal region.

Key Project Information
Architect Kennedy Fitzgerald
Duration 24 month
Extra Information
Location Moville, County Donegal
Sectors Education