Mallon Foods

Mallon Foods appointed Woodvale Construction to build and fit out an extension to their existing food processing factory in Mullaghadun, Hilden, Co. Monaghan.

Mallon Foods is the leading producer of sausages in Ireland, creating award-winning sausages in County Monaghan since 1942.

Our site team worked closely with the client to ensure the ongoing construction works did not impact daily production schedules in this live food processing facility.

The project encompasses an extension adjoining the existing food production factory with a floor area of 2949m2 and an effluent treatment plant, ESB substation and site works.

Construction works comprised of:

  • Site enabling works, including the demolition & removal of existing buildings, internal fittings, refrigerated units, etc.
  • Piled concrete foundations
  • In situ, reinforced concrete substructure comprising of ring & tie beams and RC floor slabs.
  • Structural steel frame
  • Kingspan quadcore roof & wall cladding panels
  • Aluminum windows & doors, food-grade doors, steel doors, and high-speed roller doors
  • Mechanical & Electrical services, large-scale refrigeration, and ventilation. Upgrade of the ESB supply, including a new substation.
  • External plant room and storage yard
  • Internal fit-out, including shelving, racking, storage, and the facilitation of the installation of specialist process equipment
  • Effluent treatment plans and associated site works and structures
  • All associated site development, including underground services & utilities

Phase 2 – office and amenity buildings 

Phase 2 commenced in June 2024 and was successfully completed in February 2026, delivering a high-quality, modern facility designed to support both operational efficiency and the highest standards of hygiene within a live food production environment.

The development includes a new open-plan office area, complemented by screened offices and a dedicated meeting room, promoting collaboration between teams and client engagement.

The production element incorporates a purpose-built mini production test-line constructed to food-grade specification, alongside a fully equipped display kitchen and working kitchen for live demonstrations, supporting both operational use and product showcasing.

Staff welfare and hygiene management were central to the design, with enhanced office facilities, new changing facilities, lockers, and boot-wash areas providing a controlled transition between welfare and production zones. Direct access routes to the production floor and the installation of an external goods lift further enhance operational efficiency while maintaining strict hygiene controls.

Additional facilities include upgraded client and employee welfare areas, a new canteen, a chill-out space, a wrap-around balcony, a first aid room, an accessible WC, and a cleaner’s store.

In addition, road entrance improvements, upgraded car parking, and the provision of electric vehicle charging infrastructure were completed, enhancing accessibility and supporting sustainable travel

This phase reflects a strong collaborative approach between client and contractor, delivering a facility that meets rigorous food production standards while supporting staff wellbeing and operational excellence.

 

Key Project Information
Architect Arch-Aid
Duration 40 Months
Extra Information
Location Hilden, Co. Monaghan
Sectors Commercial
We are very happy with Woodvale Construction and the team we have worked with during the contract have been professional, efficient and helpful
Brian Walsh, Managing Director, Arthur Mallon Foods