Londonderry Park Newtownards

The Londonderry Park redevelopment project comprised of a new Pavilion with offices, function and meeting rooms, 14 fully accessible changing areas including two changing rooms which meet the IFA requirements. An IFA standard referee’s room. High quality, robust finishes are used throughout. A sliding folding partition enables the function room to be subdivided for additional flexibility.

A specialist contractor installed three new 3G synthetic pitches one which meets the IFA standard for intermediate football and one which is suitable for club hockey.

Construction was planned to maintain safe access to the existing bowling green and children’s play park during the redevelopment project. Tight control of Health and Safety led to zero accidents or incidents on site during construction.

Key Features:

  • A new main Pavilion
  • A Cricket Pavilion
  • A Play Park Toilet Block and Child-changing facilities.
  • Sports pitches
  • New Car Park and Road Network

 

Londonderry Park Edit from Woodvale Construction on Vimeo.

Key Project Information
Architect Kennedy Fitzgerald Architects
Value £4.5m
Duration 12 months
Extra Information
Location Ards and North Down Borough Council
Sectors Sports and Leisure
The development makes a significant contribution to ensuring that the people of Ards have access to first class leisure and sporting opportunities