The scope of works included a crash deck above the new large base paint line and ovens at 7.3m high. This was achieved by utilising cantilever steel beams with engineered timber joists with flow forge deck and tubular balustrade edge protection.
Key Project Information
| Architect | Structural Engineer - Albert Fry Associates’ |
| Value | £180K |
| Time-line | 5 Weeks |
| Duration | 5 Weeks |
Extra Information
| Location | Caterpillar Power |
| Sectors | Industrial |